View our range of construction services

Previous Projects

Byrne & King have been working on projects in the general construction industry for over 17 years, on a huge variety of domestic and commercial projects.

Working on projects from bulk excavation and trenchwork to reinforced concrete, flooring, paving and drainage, we are proud to have always delivered the highest quality standards. Below you can see some examples of some of our recent work.

Live Projects

Contract

Company

Value

ProCathedral, Bristol (Labour / Plant & Materials)

Groundworks Package for the construction of new student accommodation in the existing Pro Cathedral in Bristol. Works involve: Pile Attendance; installation of Pile mats; construction of RC pile caps and beams inside the Cathedral and externally; ground floor slabs; drainage; ductwork, earthworks and external landscaping.

Vinci Construction

£880,000

Western Apron Extension, Bristol Airport (Labour & Plant)

Works include the construction of all RC Duct Pits; RC MH Cover Slabs; Installation of Gatic Slot Drains in the new apron as well as adjacent to the existing taxiway (Includes Night Shifts), Foundations to the new Snow Shed as well as the internal and external concrete slabs; Installation of new HML Bases and Kerbs.

VolkerFitzpatrick

£163,700

Mogden Sewerage Treatment Works, Twickenham (Labour & Plant)

Upgrading and extension of the existing Mogden STW for Thames Water. Works include; construction of new roads (Including earthworks and Kerbs); installation of drainage and ductwork and the installation of the Wash Water and Potable Water pressure pipes.

Black & Veatch

£299,400

Tedworth House – [H4H – Help For Heroes]
(Labour / Plant & Materials)

Construction works to turn an existing manor house into accommodation for injured Soldiers. Works involve: Earthworks; drainage; asphalt; road markings; tree clearance; soft strip; construction of a new 3 storey RC Building including a 4m deep basement. Installation of the temporary works and frames for the basement.

Vinci Construction

Currently at £2,500,000

ERF Newhaven (Labour / Plant & Materials)

Complete groundworks package for new Energy Recycling facility on the bank of the River Ouse. Works include all drainage / ducts / roads / earthworks / concrete service yards and deep pumping stations including a storm outfall into the River Ouse.

Hochtief

£2,350,000

 

Recently Completed Contracts:

Contract

Company

Value

Crossrail Tunnelling Academy, Ilford (Labour & Plant)

Groundworks contract for the construction of the foundations, earthworks, drainage and ducts, kerbs and roadways.

VolkerFitzpatrick

£300,00

Accolade Wines, Avonmouth (Labour / Plant & Materials)

Carry out attendance to pile testing as well as various repairs to the concrete service yard and internal warehouse floor.

VolkerFitzpatrick

£100,00

STRYKER HQ, Newbury

Foundations, Drainage, Services as well as car park and road construction for new Warehouse / Office

VolkerFitzpatrick Ltd

£271,700

Heathrow South Cargo Centre

Construction of foundations to new warehouse plus associated drainage, road construction, a pumping station and service installations.

VolkerFitzpatrick Ltd

£348,500

BHS Swindon (Labour / Plant & Materials)

RC foundations and floor slab to new BHS unit and five adjacent units. Works include internal and external drainage and associated external works.

John Sisk & Sons

£700,000

Southend Airport (Labour / Plant & Materials)

Construction of foundations to new Air Traffic Control Tower as well as the internal concrete floors. Works also include construction of two number car parks for the rail station as well as associated roads

Readie Construction Ltd

£580,000

Oakfield School, Dartford

Completed the external works to the new school (on the existing school’s grounds). Works included earthworks, drainage, ducts & all associated kerbs.

VolkerFitzpatrick Ltd

£120,000

Groundworks Package – ARU Cambridge (Labour / Plant & Materials)

Construction of RC foundations and floor slabs to new building in confirmed area within existing campus. Included all drainage (Internal & external) as well as service installations.

VolkerFitzpatrick Ltd

£900,000

Enabling Works – ARU, Cambridge (Labour / Plant & Materials)

Site preparation in advance of main works package.

VolkerFitzpatrick Ltd

£110,000

Crawley Crossing – Milton Keynes (Labour / Plant & Materials)

Part demolition of existing retention tank, pre-cast retaining wall and new road construction.

Readie Construction Ltd

£87,000

Enviro 21 Business Park – Hastings

Groundworks for 4 no. business units/offices on a site adjacent to a SSSI with particular constraints relating to wildlife and environmental controls.

VolkerFitzpatrick Ltd

£800,000

Morrison Distribution Centre – Sittingbourne

Installation of foundations, drainage, approx. 6000 no. flared head piles for a new 920,000 sq ft warehouse and distribution centre.

VolkerFitzpatrick Ltd

£1,198,000

Quadrant Park – Portishead

Foundations, earthworks, drainage and associated external works for a retail park development.

Marbank Construction Ltd

£130,000

Constellation Europe – Avonmouth

RC foundations, drainage, interceptors, pumping stations and all external works associated with a new 900,000 sq ft storage and distribution centre.

VolkerFitzpatrick Ltd

£2,840,000

BBC Broadcasting House – London

Installation of ACO Deckline drainage channel withing an existing basement plant room for the BBC.

ECEX

£20,000

Bus Depot – Cricklewood, London

Foundations, drainage and external works.

VolkerFitzpatrick Ltd

£203,000

Cullina Logistics – Haverhill

200,000 sq ft logistics centre comprising of foundations, drainage, external works and hard landscaping.

VolkerFitzpatrick Ltd

£490,000

Panasonic – Northampton

Groundworks for a new warehouse facility adjacent to Panasonic’s existing distribution centre in Northampton.

John Sisk and Sons Ltd

£363,000

Alfred Road – Paddington, London

Foundations, drainage and external works for a new arts centre in Paddington.

Readie Construction Ltd

£135,000

Head Office – Birmingham

Foundations, drainage, outfall, paving etc. for Goodmans new head office at Birmingham Business Park.

VolkerFitzpatrick Ltd

£202,000

Deseronto Trading Estate – Slough

Groundworks associated with a new 2,000 sq. ft unit.

Readie Construction Ltd

£103,000

ICI Paints – Slough

Removal and re-instatement of existing concrete access roads. Close co-ordination with ICI to maintain their operations while works were being carried out.

VolkerFitzpatrick Ltd

£208,000

 

Latest News

December 2012 - Byrne & King Ltd. are delighted to announce that we have been awarded accreditation to Safe Contractor for our commitment to achieving excellence in health and safety.

Safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.

Plant Hire Service

While our primary focus is on expert construction and groundworks provision, we do also offer our domestic and commercial customers a unique plant hire service.

Available with or without our experienced operators, our plant hire service is ideal for large scale commercial construction projects and is very reasonably priced.

Contact Us Today

If you would like any more information about our services, please visit the other pages on this website.

Alternatively, feel free to contact one of our helpful and friendly team.

Back to Top