Previous projects

Contract

Company

Value

Enabling Works – ARU, Cambridge

Site preparation in advance of main works package.

VolkerFitzpatrick Ltd

£110,000

Crawley Crossing – Milton Keynes

Part demolition of existing retention tank, pre-cast retaining wall and new road construction.

Readie Construction Ltd

£87,000

Enviro 21 Business Park – Hastings

Groundworks for 4 no. business units/offices on a site adjacent to a SSSI with particular constraints relating to wildlife and environmental controls.

VolkerFitzpatrick Ltd

£800,000

Morrison Distribution Centre – Sittingbourne

Installation of foundations, drainage, approx. 6000 no. flared head piles for a new 920,000 sq ft warehouse and distribution centre.

VolkerFitzpatrick Ltd

£1,198,000

Quadrant Park – Portishead

Foundations, earthworks, drainage and associated external works for a retail park development.

Marbank Construction Ltd

£130,000

Constellation Europe – Avonmouth

RC foundations, drainage, interceptors, pumping stations and all external works associated with a new 900,000 sq ft storage and distribution centre.

VolkerFitzpatrick Ltd

£2,840,000

BBC Broadcasting House – London

Installation of ACO Deckline drainage channel withing an existing basement plant room for the BBC.

ECEX

£20,000

Bus Depot – Cricklewood, London

Foundations, drainage and external works.

VolkerFitzpatrick Ltd

£203,000

Cullina Logistics – Haverhill

200,000 sq ft logistics centre comprising of foundations, drainage, external works and hard landscaping.

VolkerFitzpatrick Ltd

£490,000

Panasonic – Northampton

Groundworks for a new warehouse facility adjacent to Panasonic’s existing distribution centre in Northampton.

John Sisk and Sons Ltd

£363,000

Alfred Road – Paddington, London

Foundations, drainage and external works for a new arts centre in Paddington.

Readie Construction Ltd

£135,000

Head Office – Birmingham

Foundations, drainage, outfall, paving etc. for Goodmans new head office at Birmingham Business Park.

VolkerFitzpatrick Ltd

£135,000

Deseronto Trading Estate – Slough

Groundworks associated with a new 2,000 sq. ft unit.

Readie Construction Ltd

£103,000

ICI Paints – Slough

Removal and re-instatement of existing concrete access roads. Close co-ordination with ICI to maintain their operations while works were being carried out.

VolkerFitzpatrick Ltd

£208,000

Prologis Park (DC3) – Wellingborough, Northamptonshire

Construction of new Distribution Centre. Works include foundations, drainage, kerbing, ground floor slabs, earthworks and services

Fitzpatrick Contractors Ltd

£510,000

Geron Way – Cricklewood, London

Break out of existing concrete slab and installation of new foundation

A&B Construction

£10,000

Terrace Hill – Maidenhead, Berkshire

Demolition of existing and construction of new buildings. Works included pile breakdown and pile cap construction, reinforced ground floor slabs, earthworks cut & fill, drainage and kerbing.

Fitzpatrick Contractors Ltd

£550,000

Aldermaston Fuel Storage Depot - Berkshire

Construction of environmental protection spillage bunds, vehicular crossovers, access roads.

Oil and Pipelines Association

£95,000

Head Office – Hoddesdon, Hertfordshire

Construction of new Head Office Building for Fitzpatrick. Works include foundations, ground floor slab, drainage & services

Fitzpatrick Contractors Ltd

£200,000

Prologis - South Marston, Swindon

Extension of external yard slab. Works included installation of drainage channel, kerbing and new reinforced concrete slab

Norwest Holst Construction Ltd

£200,000

Prologis Park – Wellingborough, Northamptonshire

Extension of existing distribution centre. Works included foundations, drainage, kerbing and reinforced concrete bases

Fitzpatrick Contractors Ltd

£200,000

Ty Gwyn Hall – Abergavenny

New water supply pipework and sewage outfall from a private healthcare home in South Wales

Craegmoor Healthcare

£75,000

Sainsbury’s – Dartford, Kent

Construction of new distribution centre. Works included kerbing, construction of new headwalls & retaining walls and installation of drainage channels

Fitzpatrick Contractors Ltd

£190,000

Stockley Park – Hayes, Middlesex

3 new warehouse/distribution units for Pro-Logis. Works included foundations, ground floor slabs, drainage, roads, external service yards, car parks and services

Fitzpatrick Contractors Ltd

£750,000

Bag Storage Facility

Construction of an extension of an existing bag storage facility including piling, foundations, ground floor slab, paving and misc. external works.

Lafarge Cement UK

£550,000

Plot 600 – Stansted Airport

Construction of 8no. industrial warehouse units. Works included foundations, drainage and external works.

Fitzpatrick Contractors Ltd

£270,000

Pro-Logis Park – Dunstable

Construction of two new Pro-Logis warehouse units (approx. 800,000 sq ft) in Dunstable. Works included foundations, drainage, car parks and access roads.

Fitzpatrick Contractors Ltd

£900,000

South Marston Business Park Construction of two new Pro-Logis warehouse units (approx. 550,000 sq ft) in Swindon, Wiltshire. Foundations, drainage, external RC slabs, car parks and access roads.

Norwest Holst Construction Ltd

£800,000

Coal Storage Facility Provision of a temporary coal storage facility at an existing cement works in Northfleet, Kent. Erection of pre-cast retaining wall units and drainage works.

Lafarge Cement UK

£80,000

Victoria Business Park Construction of two new Pro-Logis warehouse units (approx. 500,000 sq ft) in Wellingborough, Northants. Foundations, drainage, car parks and access roads.

Fitzpatrick Contractors Ltd

£475,000

Oliver Road, West Thurrock Construction of a new warehouse unit (approx. 330,000 sq ft). Foundations, drainage, services, ground floor slabs, car parks and access roads

Fitzpatrick Contractors Ltd

£450,000

ISIS Project New research and development facility for Rutherford Appleton Laboratories. Works include excavation, foundations, RC tunnel constructions, external slabs and drainage

Scanmoor Ltd

£700,000

Brooklands, Weybridge, Surrey Construction of a new Heritage and Technology Centre for Mercedes Benz including pile caps, groundbeams, ground floor slab, drainage and ductwork.

Fitzpatrick Contractors Ltd

£650,000

West London Academy, Northolt Construction of a new teaching block adjacent to the existing college. Works included drainage, interceptors, storm cells etc.

Scanmoor Ltd

£150,000

Wiltshire Police PFI, new police headquarters in Swindon – foundations, ground floor slabs, drainage, services, car park, landscaping

Norwest Holst

£1,100,000

Lafarge Cement Theale - construction of new internal cement silo floor slabs, drainage and external works

Camb Construction

£65,000

Sir George Monoux College, new teaching accommodation in Walthamstow - foundations, below ground drainage, 17m long attenuation tank installation, external works and car park facilities

Trak Construction

£150,000

Diamond Building Project - below ground drainage, interceptors, pump station, bulk earthworks, insitu concrete slabs and access roads

Scanmoor Ltd

£400,000

Hasmonean School, new school accommodation, Mill Hill, London – foundations, drainage, external works

Trak Construction

£130,000

Reading STW, new Sewage Treatment Works – drainage and pumped mains, ductwork, external works

Taylor Woodrow

£1,500,000

Tesco Distribution Centre - installation of 3000m of drainage, manholes, interceptors, 60,000m2 of concrete hardstandings, pile caps, associated external works

Taylor Woodrow

£1,800,000

Jews Free School, Kenton - PFI project for the construction of a secondary school facility

Jarvis

£900,000

Mead Park, Harlow - construction of 4 no. warehouse units on 3 sites including foundations, drainage, external works

Trak Construction

£330,000

Railtrack Station Work - regeneration programme at the following stations:
Wanstead Park
Berkhamstead
Crouch Hill and Woodgrange Park
Hitchin

Scanmoor Ltd


£ 120,000
£ 95,000
£ 195,000
£ 142,000

Farnborough Airport - construction of 31 no. reinforced concrete manholes and catchpits

Fitzpatrick Contractors Ltd

£150,000

Theatre District - multiple retail and leisure units min. 9800m2 floor area comprising of 7 number units and all associated external works

Wilson Bowden Properties Ltd

£540,000

William Penn Nursery - reduced level dig and mass fill footings and drainage

Mansell

£60,000